Streamline
Season 6 · Episode 6 of 6 Aired Aug 29, 2012

Neptune

Wed, Aug 29, 2012
0 of 6 watched this season
Next: S7 E1

Purpose-built to install the world's most powerful wind turbines. Imagine a ship that can raise herself up 15 metres (5 storeys) out of the water to create a stable construction platform in the middle of the sea. Now add a 600-ton crane ready to reach high into the sky. That's Neptune: brand-new, ready and willing to install the world's heaviest and most powerful wind turbines on Belgium's first offshore wind farm.

Notes & ratings

0 ratings

0 notes

0 25 50 75 100

Airs

Wed, Aug 29, 2012

Show

Mighty Ships

61 episodes

Episode

S6 · E6

in Mighty Ships