Season 1 · Episode 19 of 34
Aired Jan 7, 1991
Two-family Greystone: Electrical Work Begins
Mon, Jan 7, 1991
0 of 34 watched this season
The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.
Notes & ratings
0 ratings
0 notes
0
25
50
75
100
Airs
Mon, Jan 7, 1991
Show
Home Again with Bob Vila
354 episodes
Episode
S1 · E19
in Home Again with Bob Vila